Foundation work progressing
Earth work excavation for column footings completed.Basically the soil is hard laterite in nature.But in the front side,there is an area where soil filling was done previously for flower cultivation.Hence the front columns have to start at a bit low level
Pictures show view from the house construction site and excavated areas for column footing.In the excavated area,sand filling and floor concrete is done.Column footing concrete is now in progress