Final slope roof slab is concreted on 25/11.Pictures show steel reinforcement work in progress for the slope roof
Picture above is view from roof top of house under construction
4500 sft house being constructed at Jackanarai village near Ootty in Tamil Nadu for Mr.Saravanan,Software Engineer working in USA
Final slope roof slab is concreted on 25/11.Pictures show steel reinforcement work in progress for the slope roof
Picture above is view from roof top of house under construction
After concreting first floor flat roof,work is now reaching first floor slope roof.Form work for first floor slope roof now in progress
Work has reached first floor roof level.Flat roof portions in the rear will be concreted on 27/10.Work will then start on slope roof above front Gym room and upper lounge and part of Home Theatre.Pictures show work in progress
Brick work has reached lintel level at First Floor.Precast outside stair steps are being fixed.Ground floor front side slope roof concreted.
Pictures show work in progress and me standing at open terrace area in the front side of the house where ground floor slope roof come up to become parapet for open terrace area.