Brick work has reached lintel level at First Floor.Precast outside stair steps are being fixed.Ground floor front side slope roof concreted.
Pictures show work in progress and me standing at open terrace area in the front side of the house where ground floor slope roof come up to become parapet for open terrace area.
No comments:
Post a Comment